Through accurate 3D modelling, prototyping and design development we cost effectively developed and produced offsite the very complicated double curvature timber roof structures together with the complicated glazing infill.
readCSI supplied and installed curtain walling to the retail (Decathlon) and office section of the building incorporating bespoke perforated screening, steel internal screens and prefabricated canopy structures.
readCSI designed, manufactured and installed the unitising panels from Level 2 to 12, Capless CW areas to all other areas, the Halo, cantilevered balustrade and atrium roof lights.
readPart of Hull’s extensive Building Schools for the Future Programme, Kingswood Academy opened it’s doors to 1300 students in one of the most deprived areas of the UK.
readStockport Exchange has been master planned to create a thriving commercial business district, set around new public space and amenities including a hotel, cafés, restaurants and leisure centre.
readEndike Primary School, which accommodates 420 students, was deliberately designed to allow the glazing to take centre stage.
read